Responsiveness, Integrity, Teamwork
Connect With Us
205.918.4000

Location: San Pedro, CA
Client: DFSP

The OMES Plans were prepared in compliance with federal (49 CFR Part 195; 33 CFR Parts 154/156) and state requirements for pipeline and marine transfer operations. The OMES Plans integrated DLA Energy EMS requirements with O&M requirements. DOD requirements for petroleum terminals were also incorporated into OMES Plan.

Get connected.

Follow along on social media for regular updates.